Обсуждение:Supermatter Engine

Материал из Chaotic Onyx
Перейти к навигацииПерейти к поиску

Power Management Once power is generated by the TEGs, it flows through the yellow power cables which run from the TEGs themselves to the fore-port corner of the engine room. Two SMESs draw power from this direct output circuit; the engine room SMES (visible within the engine room) and the main power grid SMES, which is in the portmost room fore of the engine room. The engine room SMES powers all of the equipment in the engine room via the Engine Room APC; the main grid SMES provides power to the rest of the station. The engine room SMES needs around 70-100kW. The main grid SMES output will depend on the station's power draw.

Версия до перевода, надо не проебать, ибо я мог напортачить с переводом.